On the 26th June Mina Zayed Abu Dhabi Terminals received a super heavy lift shipment for the Habshan 5 project, the High Pressure Observer utilised for processing gas weighted at a total of 1730 tons with an overall length of 55m by 8.5 m in width. This is the single largest piece handled in Mina Zayed in 2011.
The largest single piece of cargo handled by Mina Zayed Port in 2011
![](https://www.adports.ae/wp-content/uploads/2018/05/pic-3-.jpg)